CrapZapper, a product of H2O

Your vessel or platform

Use 24 for live-aboard crews. Loads scale with hours manned.

Doesn't change the model size. IMO adds a carbon dechlorinator after the chlorinator.

What drains to the unit
Gray water bypass

Gray water goes straight to the chlorinator and skips aeration and settling. Only toilet waste is treated biologically.

CZM-02026

Recommended model

Certificate 159.015/10209/0, USCG 33 CFR 159 Type II and IMO MEPC.227(64)

60
max persons at this setup
HydraulicGoverns1,685 of 2,026 GPD (83%)
Organic19.50 of 40.08 lb BOD/d (49%)

Where the water goes

OverboardToilets400 GPDAeration1,685 GPDSettling1,685 GPDChlorinator1,685 GPDGray water1,285 GPD

Settling sets the hydraulic limit. Gray water is treated with the toilet waste through aeration and settling.

Ready to Build?

Configure Your CrapZapper

Take this size into the CrapZapper Configurator to choose options and request a quote.

Open CrapZapper Configurator